Steimann.li Iceclimbing -> Switzerland -> Engiadina -> Flüelapass -> Flüelafall, January 1st 2026
  English   Deutsch | Main Page | Climbing | Iceclimbing | Outdoor | Photography | Links | Author |  

Picture

flueelafallsmall_1

flueelafallsmall_2

flueelafallsmall_3

flueelafallsmall_4

flueelafallsmall_5

flueelafallsmall_6

flueelafallsmall_7

flueelafallsmall_8

flueelafallsmall_9

flueelafallsmall_10

flueelafallsmall_11

flueelafallsmall_12

flueelafallsmall_13

flueelafallsmall_14

flueelafallsmall_15

flueelafallsmall_16

First Previous Next Last
flueelafall_1
Back at Flüelafall. But this time, I took the train to Susch, since my colleague stayed in Engadine.
We had the fall for us today. But this time, there was a lot more water on the right side.
The exit of the last pitch was a bit thin on ice.
And the abseil from the third to the second belaystation... 50 m is with rope stretching barely enough. So be carefull, that the rope end is slipping through your abseil device, and that you loose the end of the rope, which you have to pull. Or just bring 60 m half ropes.

Copyright © 2026 by Leonhard Pang